Menu
Contact
View COVID-19 Updates
Digital montage (1)

The Fluid Systems Engineering and Management Blog

by Swagelok Northern California

How to Select the Right Sample Preconditioning Module

by Jeff Hopkins, on 10/3/19 9:00 AM

In an analytical sampling system, you may need to precondition your sample prior to analysis. You’ll choose your preconditioning module based on the type of sample-transport system and the sample’s current phase—gas or liquid. You may need a field station module installed near the tap, or a fast-loop module installed near the analyzer.

Read the full article on Swagelok Reference Point

Topics:Mission Critical

We perform under pressure

Your fluid systems can't fail—and they can't leak. That's why Swagelok Northern California offers mission critical solutions for the petrochem, semi, power, and oil and gas industries around the Bay Area and into NW Nevada. We manufacture and assemble reliable, customizable components that get the job done. Contact our team today to learn about custom solutions for your plant or refinery.

Swagelok Northern California
Fremont headquarters

3393 W Warren Ave
Fremont, CA 94538
Main tel: 510-933-6200
Email: Message us

Areas served by our fluid systems engineering company